Construction

Success Innovation will effectively combining staff, workers, equipment and materials on a global scale, we draft detailed plans to minimize construction time and costs, while ensuring safety and quality. On site, we introduce appropriate construction methods for each project location and use a construction management system to deploy manpower efficiently.

The project team brings together talented members who are specialists in the respective fields of E (engineering), P (procurement) and C (construction). The construction group in charge of C (construction) is led by a construction manager with extensive field experience and consists of professionals each with knowledge of construction planning, construction contracts, schedule control and other specialties. This group begins the preparations to be able to start the future construction work as soon as possible. For construction work on undeveloped land the group also selects the best subcontractors from around the world to develop makeshift plans, such as setting up the construction camp and offices, and execute large-scale project construction work. In addition, at the early stage of the start of a project the group plans the requirements based on the construction schedule and procedures (known as the Constructability Study) and provides feedback on upstream process design and procurement in order to optimize the entire project.

Needless to say, safety and quality are maintained at the construction site.

http://success-innovation.de/

Available Appointments on May 28, 2022

  9:50 am – 10:20 am1 space available
  10:20 am – 10:50 am1 space available
  10:50 am – 11:20 am1 space available
  11:20 am – 11:50 am1 space available
  11:50 am – 12:20 pm1 space available
  12:20 pm – 12:50 pm1 space available
  1:20 pm – 1:50 pm1 space available